Thanks to the simplicity of the system, the installation speed of Rockflow is very high. With an optimum supply of materials, flow rates of 300 cubic metres per hour can be achieved. Furthermore, the installation of Rockflow requires no heavy equipment. The loose stone wool elements weigh a maximum of 21 kg per block, so a contractor can move them with light equipment and install them manually. A small crane to excavate the construction site, a loader to transport the stone wool blocks and manpower to place the blocks is sufficient to install Rockflow.

The installation process for a Rockflow system consists of several steps and requires specific tools and personnel. Follow the instructions as described in the quick installation guide for a straightforward and safe installation of a Rockflow attenuation and drainage system.

Download installation guide

Useful Rockflow links:

Questions? Get in touch with us: